I just noticed this within the last 2-3 days...
• When MASS processing with a Processing Stone (either of Loggia or Manos, I've used both) I only obtain around x57-65 melted lead shards.
• Each MASS Process proc uses only 115 Lead Ores, this means that only 23 batches are performed (1 batch = 5 ores). Equivalent to 260 Mastery level if related.
• This is unique only to Lead Ores; MASS Processing works fine with Iron Ores as I will obtain ~160 melted iron shards at 865 processing mastery for 64 batches and ~525 melted iron shards at 1755. Also tried Copper Ores and they work like Iron, no issues.
• This cannot be resolved by logging in and out or restarting the game or switching characters.
• Current stack of lead ores in storage at time of bug notice: Between 94k to 100k total lead ores
Tested at 865 Processing Mastery on one character AND 1755 Processing Mastery on a different character. It's only Lead Ore for some reason. Both characters had processing stones and could proc the proper rate for Iron & Copper, but not lead.
VIDEO: Processing Lead Ore, stuck at 23 batches
VIDEO: Processing Iron Ore, same character, same mastery, same equipment, same buffs, same everything conditions, no problem with Mass Process rate